Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
etd_digitization_project_shipping_process [2017/06/29 13:58]
annk
etd_digitization_project_shipping_process [2022/05/16 19:28] (current)
jeustis
Line 1: Line 1:
 +===== PAGE OUTDATED ARCHIVED =====
 +
 **ETD Digitization Project Shipping Process** **ETD Digitization Project Shipping Process**
- 
-**Link to ETD Workflow Google doc:** 
- 
-https://​docs.google.com/​document/​d/​1Qs_uIWPjDfUIcQhxJiMlgvgN8XpexZn2CTs0eSGTOxo/​edit ​ 
  
 **Item Process Statuses:** **Item Process Statuses:**
Line 15: Line 13:
 **Pulling and checking dissertations for damage pre-scanning** **Pulling and checking dissertations for damage pre-scanning**
  
-Working from the Master ETD list? select ​the dissertations to be sent out for scanning. Right now we are working on Education dissertationsLisa said about 400-500 titles will fit on the trucks. She said something ​about going to the next group of titles on the list after the ones that have DI or DO in their status.+Working from the Masterfile ​list, create an Excel list by Department (i.e. Education), sorted by call number (year, alphabetical author name). IMPORTANT: Indicate on this list which dissertations/​theses have been already scanned! Select ​the theses and dissertations to be sent out for scanning, next on the list, by the Department(s) ​we are working on.  We send the Internet Archive 6 trucks, containing ​about 500 items total--though this number will vary according to how many theses are sent relative ​to the (usually thicker) dissertations
  
-Create a pull list for the students following the examples on the W: drive. ​A first draft of detailed ​instructions at ETD Digitization Project/​Workflow ​Drafts/Pulllist_DRAFT_062817. This document will be updated as the steps are finalized.+Create a pull list for the students following the examples on the W: drive. ​Detailed ​instructions ​are available ​at ETD Digitization Project/​Workflow ​Instructions/Pulllist_Processing_Workflow. This document will be updated as steps change or are finalized.
  
   * Have students pull titles from shelves   * Have students pull titles from shelves
   * Note any missing titles as these will have to be requested from the Bunker   * Note any missing titles as these will have to be requested from the Bunker
  
-Check all titles for damage or missing pages (see Lorraine James to train new students)A more detailed ​handout ​regarding opaque pages and other things to look for is found on the W: drive under ETD Digitization project/​Workflow Drafts/​OCA_Theses_Checking_Quality_Opaque_Pages, but here are the basics : +Check all titles for damage or missing pages. ​More detailed ​handouts ​regarding opaque pages and other things to look for are found on the W: drive under ETD Digitization project/​Workflow Drafts, but here are the basics : 
  
   * YELLOW SLIP is for items with **double-sided** pages   * YELLOW SLIP is for items with **double-sided** pages
Line 59: Line 57:
 __Part 2__ __Part 2__
  
-Receive Depository items at UM and check out DP/UM items under MATMAN user.+Receive Depository items at UM and check out DP/UM items under MATMAN user. See detailed instructions at W://ETD Digitization Project/​Workflow Instructions/​PullList_Processing_Workflow under **Check out DP/UM Items under MATMAN**.
  
 All items will receive an Item Process Status of DI. Prepare the Pick List, using the Opticon device (DPN2001 Companion Application software required (Appload)). Student will change the item Process status to DI (in process for scanning) using a handheld scanner. All items will receive an Item Process Status of DI. Prepare the Pick List, using the Opticon device (DPN2001 Companion Application software required (Appload)). Student will change the item Process status to DI (in process for scanning) using a handheld scanner.
Line 66: Line 64:
 __Part 3__ __Part 3__
  
-Check in returning Bunker items+W://ETD Digitization Project/​Workflow Instructions/​PullList_Processing_Workflow under **Check in DP/UM Items under MATMAN**.
  
 **Creating the picklist** **Creating the picklist**
Line 105: Line 103:
 Then using Aleph Services change all the item process statuses on the new shipment from DI (in process for scanning) to DO (out for scanning). ​ Make sure to do it in this order. ​ Take DO out of the records for the old shipment before changing the new shipment to DO. Then using Aleph Services change all the item process statuses on the new shipment from DI (in process for scanning) to DO (out for scanning). ​ Make sure to do it in this order. ​ Take DO out of the records for the old shipment before changing the new shipment to DO.
  
 +//updated 7/3/2017 by AMK//
etd_digitization_project_shipping_process.1498744699.txt.gz · Last modified: 2019/01/07 17:20 (external edit)
[unknown link type]Back to top
www.chimeric.de Creative Commons License Valid CSS Driven by DokuWiki do yourself a favour and use a real browser - get firefox!! Recent changes RSS feed Valid XHTML 1.0