This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
monographs_workflow_overview [2016/05/13 17:22] raddison [Non-shelf ready firm orders] |
monographs_workflow_overview [2016/05/13 17:22] raddison [Approvals] |
||
---|---|---|---|
Line 24: | Line 24: | ||
Item status is changed to PC for items going to Cataloging for further work. | Item status is changed to PC for items going to Cataloging for further work. | ||
- | For items going to Ref Consid shelves, item processing status is changed to PC, and a note is entered in the Internal Note field in the item record to that effect. If an item is selected for Reference, Acquisitions changes the Holdings and Item records to the appropriate codes, i.e. collection code for Reference in HOL and Item records, Reference in item status. The Internal Note field needs to be deleted when the item is removed from the Ref Consid shelves, whether going to Reference or not, to avoid future confusion. | + | For items going to Ref Consid shelves, item processing status is changed to PC, and a note is entered in the Internal Note field in the item record to that effect. If an item is selected for Reference, BAMU changes the Holdings and Item records to the appropriate codes, i.e. collection code for Reference in HOL and Item records, Reference in item status. The Internal Note field needs to be deleted when the item is removed from the Ref Consid shelves, whether going to Reference or not, to avoid future confusion. |